Key points are not available for this paper at this time.
On average, most estimated correlation coefficient were of similar magnitude to those observed by independent research groups. The role of the preliminary validity studies, and various benefits drawn from these studies for further planning of the EPIC project are discussed.
Rudolf Kaaks (Sat,) studied this question.