Answers are grounded in this paper and cite their sources.
Mixed integer programming and parallel-machine job shop scheduling are used to solve the sugarcane rail transport scheduling problem. Constructive heuristics and metaheuristics were developed to produce a more efficient scheduling system and so reduce operating costs. The solutions were tested on small and large size problems. High-quality solutions and improved CPU time are the result of developing new hybrid techniques which consist of different ways of integrating simulated annealing and Tabu search techniques.
No takes yet. Share an insight, caveat, or question.
Masoud et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: