Demonstrates a two-stage MILP framework for improved scheduling performance in manufacturing networks, indicating significant enhancements in on-time fulfillment and backlog elimination.
Real-time coordination across OEM–Tier-1 manufacturing networks remains challenging due to delayed shop-floor data, stochastic machine availability, and the need for schedule stability. This paper presents a protocol-agnostic, two-stage mixed-integer linear programming (MILP) framework for real-time family-level scheduling. The method integrates MTConnect-like data streams without requiring adherence to any single communication standard. In Stage 1, a baseline plan is generated using expected capacity; in Stage 2, a rolling-horizon recourse model adapts the plan to observed (possibly lagged) capacity while incorporating a stability penalty to control resequencing. A synthetic OEM–Tier-1 testbed with three machines (two Tier-1, one OEM) is used to benchmark performance under real-time (L = 0) and delayed (L = 5) data scenarios. Across these scenarios, the real-time rolling scheduler improves strict on-time fulfillment by approximately 70% and eliminates terminal backlog relative to static planning, while MILP solve times remain under 0.1 s per cycle. Sensitivity experiments that vary disruption intensity, replanning interval (Δ), and stability weight (λ) show consistent qualitative trends and illustrate how the framework can be tuned to balance service performance against schedule stability without sacrificing computational tractability.
No takes yet. Share an insight, caveat, or question.
Parmar et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: