Integrated Infrastructure for Photovoltaics, Electric Vehicle Charging, and eVTOL Readiness in a Medium-Sized City: A GIS–MCDA Pipeline with AHP/WLC and Sensitivity Analysis in Juiz de Fora (MG) | Synapse