Evaluates dynamic stability in isolated power systems, indicating safe expansion limits.
Industrial isolated power systems are highly sensitive to load disturbances due to their limited inertia and absence of large-grid support. This article analyzes the dynamic stability of an isolated system with a current available generation contribution of approximately 24 MW, evaluating the integration of a new production plant planned to be integrated in two construction phases of 2 MW each (total 4 MW). The system operates with local generation at 13.8 kV and distribution at 34.5 kV; therefore, demand expansion requires a detailed assessment to maintain safe operating conditions. In addition, the study verifies compliance with spinning reserve requirements for Phase 1 and Phase 2 in accordance with applicable industrial power system criteria, including IEEE 3007.1 and IEEE C37.106, as part of the N−1 security assessment. The developed stability analysis is based on time-domain dynamic simulations using IEEE AC8C excitation models and a UG-8 governor. The results show that, under severe contingencies, the frequency nadir can reach deviations close to 1.5 Hz and RoCoF values above 4 Hz/s. The results indicate that Phase 1 (2 MW) can be incorporated while maintaining acceptable spinning reserve margins, whereas the additional 2 MW corresponding to Phase 2 cannot be integrated under the current operating conditions without violating reserve criteria. However, the system remains stable when generators operate under automatic voltage control, while fixed power factor mode produces less robust responses. Based on this result, the dynamic analysis is focused on the Phase 1 condition under critical contingencies, particularly the sudden outage of the 5 MW and 8 MW generating units, with special emphasis on the outage of the largest generator, mitigated through spinning reserve support and a RoCoF-based load shedding scheme of approximately 4.4 MW. Likewise, the energization of the new plant through the 8 km line requires the evaluation of the available reactive compensation resources, including the use of capacitor banks/reactive support, to prevent underexcitation and maintain acceptable voltage conditions.
No takes yet. Share an insight, caveat, or question.
Chico et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: