In some production processes and administrative processes, the occurrence of certain events is best described by a geometric distribution. Control charts are developed for the total number of events and for the average number of events in a fixed number of units. Computer simulation is used to demonstrate the consequences of applying a standard c-chart or u-chart when the geometric model is appropriate. In a simulated example, construction of a control chart based upon a geometric distribution reduces the false alarm rate from 9.6% to 0.9%. In conclusion, two examples illustrating the applicability of these charts are presented.
No takes yet. Share an insight, caveat, or question.
Kaminsky et al. (1992) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: