Answers are grounded in this paper and cite their sources.
We consider the following general scheduling problem. The input consists of n jobs, each with an arbitrary release time, size, and monotone function specifying the cost incurred when the job is completed at a particular time. The objective is to find a preemptive schedule of minimum aggregate cost. This problem formulation is general enough to include many natural scheduling objectives, such as total weighted flow time, total weighted tardiness, and sum of flow time squared. We give an O(log log P ) approximation for this problem, where P is the ratio of the maximum to minimum job size. We also give an $O(1)$ approximation in the special case of identical release times. These results are obtained by reducing the scheduling problem to a geometric capacitated set cover problem in two dimensions.
No takes yet. Share an insight, caveat, or question.
Bansal et al. (2014) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: