Mæsk Olie og Gas AS has as operator for the Danish Underground Consortium (DUC) discovered and initiated the development of the Halfdan accumulation located in the southern part of the Danish North Sea. The accumulation comprises oil and gas in a low permeability chalk reservoir located outside structural closure. This paper describes how the phased, fast track development of Halfdan was planned and executed while testing a new concept for constructing an aligned sweep pattern. Tilted oil-water and gas-oil contacts across the Halfdan area are indicative of non-equilibrium conditions. The nonstructural trapping in the Halfdan area is provided by a combination of up dip thinning of the hydrocarbon bearing section, late structural tilting and the slow re-adjustment caused by the low permeability. Accelerated and stepwise development was pursued to allow continuous optimisation of the development in light of the significant uncertainties associated with the fluid distribution and reservoir production characteristics. Appraisal drilling from a template and tie-back of the appraisal wells to temporary production facilities via the drilling rig and early deployed pipelines enabled production from the Halfdan 10 months after finalising the discovery well. Furthermore, a temporary water injection package installed on the drilling rig enabled evaluation of water injection before the installation of permanent facilities including determination of displacement efficiency, fracturing pressure and induced fracture orientation. Halfdan was produced through permanent facilities less than 18 months after finalising the discovery well.
No takes yet. Share an insight, caveat, or question.
Albrechtsen et al. (2001) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: