Key points are not available for this paper at this time.
Remaining Useful Life (RUL) forecasting models are essential to enable predictive maintenance strategies. However, selecting the most appropriate model based solely on conventional accuracy metrics may be insufficient for practical decision making, where an adequate prediction horizon is required to plan maintenance activities. This study investigates the impact of prediction horizon on model performance and its implications for maintenance decision making. A multi-horizon evaluation approach is applied to assess model accuracy across different predictive horizons. The results show the fluctuation of accuracy and prediction error over different prediction horizons. Across both datasets, predictive accuracy was generally lowest at the long horizon (11.64–86.62%), remained variable at the medium horizon (18.13–82.04%), and was highest at the short horizon (30.29–98.25%). The results demonstrate that model performance varies significantly with the prediction horizon, highlighting a trade-off between prediction accuracy and the time available for operational planning. These findings emphasize that models with high short-term accuracy may not necessarily support effective maintenance decisions if sufficient lead time is not provided. The findings show how prediction horizon considerations shall be integrated into a risk-based evaluation framework, in which model performance is interpreted in relation to the operational consequences of prediction errors. A complete risk-based predictive maintenance framework is proposed to support a shift toward comprehensive, risk-based evaluation as a prerequisite for reliable and effective RUL prediction in predictive maintenance systems.
El-Thalji et al. (Thu,) studied this question.