If at least one out of two serial machines that produce a specific product in manufacturing environments malfunctions, there will be non conforming items produced. Determining the optimal time of the machines' maintenance is the one of major concerns. While a convenient common practice for this kind of problem is to fit a single probability distribution to the combined defect data, it does not adequately capture the fact that there are two different underlying causes of failures. A better approach is to view the defects as arising from a mixture population: one due to the first machine failures and the other due to the second one. In this article, a mixture model along with both Bayesian inference and stochastic dynamic programming approaches are used to find the multi-stage optimal replacement strategy. Using the posterior probability of the machines to be in state λ1, λ2 (the failure rates of defective items produced by machine 1 and 2, respectively), we first formulate the problem as a stochastic dynamic programming model. Then, we derive some properties for the optimal value of the objective function and propose a solution algorithm. At the end, the application of the proposed methodology is demonstrated by a numerical example and an error analysis is performed to evaluate the performances of the proposed procedure. The results of this analysis show that the proposed method performs satisfactorily when a different number of observations on the times between productions of defective products is available.
No takes yet. Share an insight, caveat, or question.
Nezhad et al. (2010) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: