Answers are grounded in this paper and cite their sources.
We examine a failure model for a system existing in a random environment. The system accumulates damage through a shock process and the failure time depends on the accumulated damage in the system. The cumulative damage process is assumed to be a semi-Markov process. Upon failure the system must be replaced by a new identical one and a failure cost is incurred. If the system is replaced before failure, a smaller cost is incurred. We allow a controller to replace the system at any stopping time before failure time. We consider the problem of specifying a replacement rule which minimizes the total long-run average cost per unit time.
No takes yet. Share an insight, caveat, or question.
Dror Zuckerman (1978) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: