In this research paper, we discuss the use of calibration technique to propose some new estimators under stratified sampling design and its use in reliability engineering. We first proposed the estimators using the calibration technique and then modify the already existing control charts such as Shewhart, exponentially weighted moving average and hybrid exponentially weighted moving averages using these calibration estimators. We also have studied the use of the proposed control charts in detail by showing their efficiency in terms of average run length. We find out that a hybrid control chart is more effective to detect the early shifts in the mean of the process.
No takes yet. Share an insight, caveat, or question.
Jabeen et al. (2022) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: