Answers are grounded in this paper and cite their sources.
The optimization process of the total generation cost is very important in a power system. Economic Load Dispatch (ELD) and Unit Commitment (UC) are very important applications to predict the optimized cost of load in a power system. UC determines working states for existing generating units under some operational constraints and then optimizing the operation cost for all running units w.r.t. load demand using economic dispatch. This paper shows a novel approach in view of Genetic Algorithm (GA) or Dynamic Programming (DP) to study UC and then Grey Wolf Optimization (GWO) technique is presented to give the solution of the constrained ELD problem of thermal plants depending on UC solution. The IEEE 30 bus system is used to test the demonstration of the solution quality, computation efficiency and the feasibility of the application of GWO algorithm for ELD problem compared with results from other techniques.
No takes yet. Share an insight, caveat, or question.
Hassan et al. (2017) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: