Uncertainty in power system planning problems can be categorized into two types: exogenous and endogenous (or decision-dependent) uncertainty. In the latter case, uncertainty resolution depends on a choice (the value of some decision variables), as opposed to the former case in which the uncertainty resolves automatically with the passage of time. In this paper, a novel stochastic multistage planning model is proposed that considers endogenous uncertainty around consumer participation in demand-side response (DSR) schemes. This uncertainty can resolve following DSR deployment in two possible ways: locally (at a single bus) and globally (across the entire system). The original formulation is decomposed with the use of Benders decomposition to improve computational performance. Two versions of Benders decomposition are applied: the classic version involving sequential implementation of all operational subproblems and a novel version, specific to problems with endogenous uncertainty, which allows for the parallel execution of only those operational subproblems that are guaranteed to have a unique contribution to the solution. Case studies on 11-bus and 123-bus systems illustrate the process of endogenous uncertainty resolution and underline the strategic importance of deploying DSR ahead of time.
No takes yet. Share an insight, caveat, or question.
Giannelos et al. (2018) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: