A distributed event processing system consists of one or more nodes (machines), and can execute a directed acyclic graph (DAG) of operators called a dataflow (or query), over long-running high-event-rate data sources. An important component of such a system is cost estimation, which predicts or estimates the “goodness” of a given input, i.e., operator graph and/or assignment of individual operators to nodes. Cost estimation is the foundation for solving many problems: optimization (plan selection and distributed operator placement), provisioning, admission control, and user reporting of system misbehavior. Latency is a significant user metric in many commercial real-time applications. Users are usually interested in quantiles of latency, such as worst-case or 99 th percentile. However, existing cost estimation techniques for event-based dataflows use metrics that, while they may have the side-effect of being correlated with latency, do not directly or provably estimate latency. In this paper, we propose a new cost estimation technique using a metric called Mace (Maximum cumulative excess). Mace is provably equivalent to maximum system latency in a (potentially complex, multi-node) distributed event-based system. The close relationship to latency makes Mace ideal for addressing the problems described earlier. Experiments with real-world datasets on Microsoft StreamInsight deployed over 1-13 nodes in a data center validate our ability to closely estimate latency (within 4%), and the use of Mace for plan selection and distributed operator placement.
No takes yet. Share an insight, caveat, or question.
Chandramouli et al. (2011) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: