In this paper, we propose to analyse the practical task of dealing with uncertainty for security management by Transmission System Operators in the context of day-ahead planning and intraday operation. We propose a general but very abstract formalization of this task in the form of a three-stage decision making problem under uncertainties in the min-max framework, where the three stages of decision making correspond respectively to operation planning, preventive control in operation, and post-contingency emergency control. We then consider algorithmic solutions for addressing this problem in the practical context of large scale power systems by proposing a bi-level linear programming formulation adapted to the case where security is constrained by power flow limits. This formulation is illustrated on two case studies corresponding respectively to a synthetic 7-bus system and the IEEE 30-bus system.
No takes yet. Share an insight, caveat, or question.
Panciatici et al. (2010) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: