We present a multi-period stochastic mixed integer programming model for power generation scheduling in a day-ahead electricity market. The model considers various scenarios and integrates the idea of reserve shortage pricing in real time. Instead of including all the possible scenarios, we parsimoniously select a certain number of scenarios to limit the size of the model. As realistic size models are still intractable for exact methods, we propose a heuristic solution methodology based on scenario-rolling that is capable of finding good quality feasible solutions within reasonable computation time.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2010) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: