Answers are grounded in this paper and cite their sources.
Two scheduling problems are considered: (1) scheduling n jobs non-preemptively on a single machine to minimize total weighted earliness and tardiness (WET); (2) scheduling n jobs non-preemptively on two parallel identical processors to minimize weighted mean flow time. In the second problem, a pre-ordering of the jobs is assumed that must be satisfied for any set of jobs scheduled on each specific machine. Both problems are known to be NP-complete. A 0-1 quadratic assignment formulation of the problems is presented. An equivalent 0-1 mixed integer linear programming approach for the problems are considered and a numerical example is given. The formulations presented enable one to use optimal and heuristic available algorithms of 0-1 quadratic assignment for the problems considered here.
No takes yet. Share an insight, caveat, or question.
Alidaee et al. (1994) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: