An algorithm using pattern recognition techniques and current weather parameters to forecast hourly electric load with a lead time of one to three hours is proposed. The lead time can be increased to at most 24 hours with the use of forecasted weather parameters.
No takes yet. Share an insight, caveat, or question.
Dehdashti et al. (1982) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: