Answers are grounded in this paper and cite their sources.
Finding a valid timing constraint is one of the most important issues in the real-time monitoring area. To get the valid timing constraint, a developer executes a real-time process and changes the constraint on a regular basis. This is an exhaustive and time-consuming process. To improve this approach, we propose a timing constraint search technique. This technique uses two load models and one condition proposed in this paper to support the developer in determining the valid timing constraint range in an easy and systematic manner.
No takes yet. Share an insight, caveat, or question.
Jeong et al. (2006) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: