Demonstrates an integrated scheduling system to enhance productivity in shipbuilding, suggesting practical implications for industry efficiency.
Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.
No takes yet. Share an insight, caveat, or question.
Kim et al. (2007) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: