Answers are grounded in this paper and cite their sources.
This paper addresses methods for formulating and solving a general class of nonpreemptive resource-constrained project scheduling problems in which job durations are discrete functions of committed renewable, nonrenewable and doubly-constrained resources (multi-mode time resource tradeoff). We present a stochastic scheduling method which solves these problems to sub-optimality in an efficient way. Computational results demonstrate that this method is highly superior to other well-known existing deterministic scheduling rules. Extensions to problems in which job-specific (demand) resource profiles are varying with time, in addition to time-varying supply resource profiles, are discussed as well. Notes Handled by the Department of Planning, Scheduling, and Control.
No takes yet. Share an insight, caveat, or question.
Drexl et al. (1993) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: