This paper presents a real-time implementation of a multiagent-based game theory reverse auction model for microgrid market operations featuring conventional and renewable distributed energy resources (DER). Studies were conducted on a grid connected microgrid consisting of a synchronous generator, two inverter-based generation units, and a combined load. The multiagent-based platform was applied to monitor, control, and perform the reverse auction process of DERs. A competitive game-theory reverse auction model was investigated to schedule the DER unit commitment with an hour-ahead market approach for the 24 h of the day. The proposed methodology was realistically implemented and operated at the Florida International University smart grid test system. The investigation shows that the proposed algorithm and the industrial hardware-based infrastructure can be implemented in the existing electric utility grid as new assets of the system are added.
No takes yet. Share an insight, caveat, or question.
Cintuglu et al. (2015) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: