In this paper, integrated planning of production, imperfect maintenance and process inspections in a multi-machine system is investigated. This system consists of parallel machines which deteriorate with time and they may shift from a primarily in-control state to a degraded state with a higher defective rate or to a failed state. Maintenance scheduling corresponds to a discrete time age-based imperfect maintenance with a large number of maintenance alternatives. Process inspections are considered to detect the current state of the system. Detecting a deteriorated condition initiates the quality check of the related sub-lots, rework of defective items and a process adjustment that brings the machine in its normal conditions. Production planning includes a capacitated lot-sizing problem with multiple products. We propose a joint approach that coordinates the decisions of the three functions, where the objective function minimises the total cost. Evaluation of costs and interacting factors is presented and two heuristic methods are proposed to solve the problem. The results of the joint model are compared to a non-integrated method and a sensitivity analysis is conducted.
No takes yet. Share an insight, caveat, or question.
Fakher et al. (2016) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: