PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
August 1, 1980Journal of Operations Management53 citations

A comparison of MRP lot sizing methods considering capacity change costs

View Full Paper
DCDavid Collier

Key Points

Key points are not available for this paper at this time.

Abstract

Abstract Capacity management is the planning and leveling of resources required (load) against the resources available (capacity). In this study, the lot size models used by Material Requirements Planning (MRP) had a major effect on the work center load profiles generated by Capacity Requirements Planning (CRP). Therefore, the selection of lot size models for MRP systems is an important decision for capacity management as well as materials management. The results of this study highlight the operating characteristics of specific lot size models considering setup, inventory carrying, and capacity associated costs. For example, the Economic Order Quantity model and the Lot‐For‐Lot model in certain situations can help level load. The Periodic Order Quantity and Least Total Cost models especially for high cost structure ratios tend to result in erratic and lumpy work center load profiles. The reasons for such operating behavior are examined. Other concepts and relationships important to capacity management are discussed.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

David Collier (1980) studied this question.

synapsesocial.com/papers/6a1a1a413f3ec013f0df7c5fhttps://doi.org/10.1016/0272-6963(80)90008-x
Ask AI
Helpful
Bookmark
Share
View Full Paper