Los puntos clave no están disponibles para este artículo en este momento.
Production planning and control (PPC) systems are used to organize operating materials. In order to address connectivity demands of interacting PPC systems a new software architecture has been presented in prior work. This software architecture provides a basis for data exchange in-between such systems. It is up to this paper to describe an implementation approach realizing the theory. Furthermore, a new optimization process which targets subcontracting, dynamics and communication of interconnected PPC systems is presented. As a result, the mandatory and optional content of an order enquiry as well as of a response message is discussed.
Ellwein et al. (Wed,) studied this question.