A critical challenge for the evolution of smart distribution systems is the shortage of measurement devices, along with the complexity and the high costs for deploying new fine-grained monitoring infrastructures. To address this issue, this paper investigates the feasibility of upgrading the grid synchronization algorithms running in the control unit of grid-following power converters to turn them into auxiliary embedded measurement devices supporting system observability. This goal can be achieved in two alternative ways: either by using an algorithm originally designed for a Phasor Measurement Unit (PMU) to perform grid synchronization or, conversely, by applying a grid synchronization technique for synchrophasor estimation. To compare advantages and disadvantages of either approach, both a 2-stage Tuned Lightweight version of the Taylor-Fourier Transform (2-stage TLTFT) algorithm and a Phase-Locked Loop embedding a custom Third-Order Generalized Integrator (TOGI-PLL) are analyzed both in the P Class PMU testing conditions specified in the IEEE Standard IEC/IEEE 60255-118-1:2018 and considering the requirements for grid connection reported in the IEEE Standard 1547-2023. Extensive simulation results show that the general idea of a joint solution for synchrophasor estimation and grid synchronization is viable in either way, although some improvement is needed. In particular, the 2-stage TLTFT algorithm generally returns more accurate results and shorter response times than the TOGI-PLL, but it is also more computationally demanding. Further simulations, based on a real power electronic converter model, confirm that, when either algorithm is used in the control loop for grid synchronization, the generated output voltage is stable.
No takes yet. Share an insight, caveat, or question.
Singh et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: