Answers are grounded in this paper and cite their sources.
The paper presents a new approach for robots tasks allocation and scheduling in order to minimize the total execution time (makespan) of a mission while satisfying all the tasks constraints. This approach is implemented in a multi-agent architecture for remote control of heterogeneous multi-robot systems. The agents controlling the robots coordinate their actions and cooperate to achieve the assigned mission. The proposed approach is carried out in two phases. During the first phase, a negotiation process (based on the Contract-net protocol) is carried out between the agents of the system to allocate the tasks to the robot proposing the minimal execution time (cost). In the second phase, a local scheduling process based on priority rules is carried out by the corresponding agent for each allocated task in order to minimize its inoccupation (idle) time.
No takes yet. Share an insight, caveat, or question.
Maoudj et al. (2015) studied this question.
Synapse has enriched 6 closely related papers on similar clinical questions. Consider them for comparative context: