The performance of Release 4 of TSS/360 at the T. J. Watson Research Center was dramatically improved in the three-month period from November, 1969, through January, 1970. The improvements consist of an increase in system responsiveness by a substantial factor together with an increase in throughput. This was achieved by methodically adjusting the parameters of the TSS/360 Table-Driven Scheduler in accordance with the Principles of Balanced Core Time and Working Set Size.
No takes yet. Share an insight, caveat, or question.
Walter J. Doherty (1970) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: