PulseExploreJournal ClubDebatesTrendingResearchersJournals
Instagram
HomeExploreJournal ClubTrending
Synapse
⌘+K
Synapse
June 3, 2026Mathematics1 citationsOpen Access

Dynamic Bayesian Modeling of Carbon-Adjusted Costs and Supply Chain Risks for Sustainable Investment in Power Grid Technical Renovation Projects

View Full Paper
MSMiaohuan SongState Grid Corporation of China (China)MLMaoning LiEconomic Research InstituteXZXiaomei ZhangEconomic Research Institute

Key Points

  • This research aims to develop a dynamic Bayesian model for forecasting carbon-adjusted costs and prioritizing investments in power grid renovation projects.
  • Developed a dynamic Bayesian model incorporating engineering, supply chain, and sustainability variables.
  • Employed random forest for variable identification using 800 project-level records.
  • Conducted ablation and scenario analyses to evaluate the model's performance against benchmarks like XGBoost.
  • The proposed model achieved lower Mean Absolute Error (MAE) and Root Mean Square Error (RMSE) compared to static Bayesian inference and other benchmarks.
  • Incorporation of supply chain and sustainability variables improved predictive performance and decision interpretability.
  • Results support budget control and prioritization of sustainable asset renewal in energy enterprises.

Abstract

Power grid technical renovation projects are implemented through project-based supply chains involving equipment procurement, logistics coordination and on-site construction under market, delivery and carbon constraints. Their final cost is jointly affected by engineering quantities, supplier behavior, lead-time uncertainty, material price volatility and sustainability requirements. Existing studies usually emphasize technical parameters and direct expenditure, whereas supplier reliability, green procurement, carbon intensity and procurement contingency effects are only indirectly incorporated. This study develops a dynamic Bayesian model for carbon-adjusted cost forecasting and investment priority support in power grid technical renovation projects. Based on 800 anonymized project-level records, a random forest is first used to identify informative engineering, supply chain and sustainability variables. These variables are then organized in a Bayesian network that links observed evidence, intermediate cost nodes and the carbon-adjusted cost target. A dynamic evidence-weighting mechanism updates posterior cost beliefs as supplier, logistics, market and carbon information become available during implementation. Compared with static Bayesian inference, XGBoost, an improved BPNN and GRA-based benchmarks, the proposed model yields lower MAE and RMSE. Ablation and scenario analyses further show that supply chain and sustainability variables improve both predictive performance and decision interpretability. The results provide a quantitative basis for budget control, green procurement adjustment, contingency allocation and sustainable asset renewal prioritization in energy enterprises.

Ask AI
Helpful
Bookmark
Share
View Full Paper

Cite This Study

Song et al. (2026) studied this question.

synapsesocial.com/papers/6a1fc530dee9eb8c0dce68c8https://doi.org/10.3390/math14111921
Ask AI
Helpful
Bookmark
Share
View Full Paper