Implementing large-scale information system (IS) projects can be challenging; projects can get bogged down with technical and logistical details. Yet, the biggest threat is a communication style that does not meet the needs of the team involved.
No takes yet. Share an insight, caveat, or question.
Roy L. Simpson (1996) studied this question.