Class points have been accepted to estimate the size of object oriented (OO) products and to directly predict the effort, cost and duration of the software projects. Most estimation models in use or proposed in the literature are based on regression techniques. In this paper, we attempt on using neural networks to estimate the development effort of OO systems using class points. The estimation model uses class points as the independent variable and development effort as the dependent variable. The results show that the estimation accuracy is higher in neural networks compared to the regression model. This experiment is carried out using the data set used in the literature
No takes yet. Share an insight, caveat, or question.
Kanmani et al. (2007) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: