Case study shows effective production planning in steel manufacturing, implying simpler solutions are achievable.
In this paper, a case study accomplished for the production planning of a German steel producer is presented. This includes the description of a lot-sizing problem and a related simple mathematical model formulated in order to meet the requirements for the mid- to long-term planning of the steel producer. Both the mathematical model and the representation of the results had to be implemented based on standard software products, namely the 'ILOG OPL-Studio' from IBM and the 'Advanced Planner and Optimizer' (APO) from SAP. The main focus is on the model and its implementation. That is, we show that a real-world problem can be solved by means of a simple mathematical model and standard software products reducing the individual programming effort. [Submitted 02 February 2009; Revised 06 November 2009, 16 February 2009; Accepted 23 February 2010]
No takes yet. Share an insight, caveat, or question.
Witt et al. (2010) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: