An effective scheduling policy known as the Dynamic Cycle Lengths Heuristic was introduced by Leachman and Gascon in 1988 for the multi-item, single-machine production system facing stochastic, time-varying demands. In this article we develop a heuristic scheduling policy for the multi-machine extension of the same problem. We integrate the concepts of the Dynamic Cycle Lengths Heuristic with a nonlinear integer optimization model to obtain an overall scheduling policy that allocates items to machines and schedules production quantities during the next time period. We report promising performance in limited simulation tests of the policy.
No takes yet. Share an insight, caveat, or question.
Gonçalves et al. (1994) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: