The deformation control effect of loess tunnel composite foundation plays an important role in optimization design and reinforcement effect evaluation. Systematically evaluate the adaptability of the composite foundation of jet grouting pile in shallow collapsible loess tunnel. Taking the shallow buried section of Fujiyao Tunnel with a buried depth of 20 m as an example, using MIDAS finite element numerical simulation software, the foundation deformation control during construction and settlement control after construction are systematically studied, the differential deformation control is analyzed, and the reinforcement effect of the tunnel bottom is evaluated. The results show that the uplift displacement can be controlled by changing the pile length and increasing the replacement ratio. The combination of long and short piles can significantly reduce the uneven settlement and plastic zone of the foundation. The uneven settlement of 9 mm can be used as the evaluation index of the composite foundation reinforcement effect in a shallow buried section of the loess tunnel.
No takes yet. Share an insight, caveat, or question.
Li et al. (2023) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: