Wind energy harnessing is a new energy production alternative in Iceland. Current installed wind power in Iceland sums to 1.8 MW, which in contrast is 0.1% of the country’s total electricity production. This article is dedicated to the exploration of the potential cost of wind energy production at Búrfell in the south of Iceland. A levelized cost of energy (LCOE) approach was applied to the estimation of the potential cost. Weibull simulation is used to simulate wind data for calculations. A confirmation of the power law is done by comparing real data to calculated values. A modified Weibull simulation is verified by comparing results with actual on-site test wind turbines. A wind farm of 99MWis suggested for the site. Key results were the capacity factor (CF) at Búrfell being 38.15% on average and that the LCOE for wind energy was estimated as 0.087–0.088 USD/kWh (assuming 10% weighted average cost of capital (WACC)), which classifies Búrfell among the lowest LCOE sites for wind energy in Europe.
No takes yet. Share an insight, caveat, or question.
Ragnarsson et al. (2015) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: