Key points are not available for this paper at this time.
Switch 2.0 is an open-source platform for planning transitions to low-emission electric power systems, designed to satisfy 21st century grid planning requirements. Switch can plan investments and/or operations while considering detailed models of emerging technologies for renewable integration. Applications include integrated resource planning, basic research, and economic, technical or policy analysis. Power system elements include unit commitment, part-load efficiency, fuel supply curves, planning and operating reserves, storage, demand response, hydroelectric networks, and policy constraints. Switch’s novel architecture allows users to compose customized models by choosing built-in modules à la carte or writing custom modules. MSC: 90-04, 90B10, 90B30, 90B50, 90C05, 90C06, 90C11, 90C15, 90C90, Keywords: Power system planning, Capacity expansion planning, Power system economics, Renewable energy sources, Energy storage, Smart grids, Open-source software
Johnston et al. (Fri,) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: