Archaeological monitoring identified limited features during excavation for a solar farm project.
Trial trenching for proposed solar farm The archaeological work was undertaken over 6 days starting on the 31st August 2023, between 18th and 19th October 2023, and between 22nd and 24th July 2024. The groundworks comprised 18 test pits and 2 trackway easements within Zone 2, and 4 trenches within Zones 2, 3 and 8. During the archaeological monitoring undated 2 pits were observed along the trackways in Zone 3 and 8, with no other features of archaeological interest recorded in the test pits and cable trenches.