A multiperiod network reconfiguration to meet the requirement of hourly hosting capacity under a minimal required number of switching operations, taking into consideration the uncertainty of renewable generation, is formulated as a nonlinear, nondifferentiable integer optimization problem with nonlinear equality and inequality constraints. A four-stage solution methodology, including an assessment stage, a time-partitioning stage, an optimization stage, and an evaluation stage, is developed to solve the constrained large-scale nonlinear integer optimization problem. A fuzzy C-means clustering algorithm is applied to partition the time period to facilitate the design of a minimum-number switching solution. A hybrid particle swarm optimization algorithm is developed to find an optimal network topology for each partitioned time period. The IEEE 123-bus case and a 1001-node system, three-phase and unbalanced, are used to evaluate the proposed method with promising results.
No takes yet. Share an insight, caveat, or question.
Fu et al. (2018) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: