Electric buses (e-buses) powered solely by batteries face challenges like limited range, long charging times, recurring bigger battery costs, and insufficient infrastructure, hindering their widespread adoption. To address these issues, a hybrid in-motion charging (IMC) enabled e-bus system is proposed where the buses are powered by overhead catenary cables for some parts of their route and supported by a smaller onboard battery for the rest. Thus, significantly reducing range anxiety compared to pure battery-operated e-buses, while also offering greater manoeuvrability due to the onboard battery. A bi-objective optimization framework evaluated the trade-off between total investment cost and the environmental benefits to the near-road population from transitioning to e-buses. To account for uncertainties in energy consumption and power transfer from the catenary cable to the battery, a robust optimization framework was formulated, ensuring resilience under varying field operating conditions. Our model, tested on Delhi’s bus network, indicates that electrifying around 1/5th of the route in the deterministic case and 1/4th under robust planning will ensure uninterrupted e-bus operations. IMC proves more cost-efficient in the long-term, particularly at higher fleet replacement, compared to terminal charging (TC) under similar operational scenarios. This study also recommends key policy measures emerging from Delhi’s case study.
No takes yet. Share an insight, caveat, or question.
Nasar et al. (2025) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: