The ground impedance (insulation resistance Risol) of photovoltaic (PV) modules is usually measured only in the dry state, even though arrays frequently operate under dew-wet or rain-wet conditions, when leakage paths can change. We measured dry insulation resistance Rdry and IEC 61215 MQT 15 wet leakage resistance Rwet for N = 37 field-aged crystalline-silicon modules from utility-scale plants and related the results to the IEC 40 MΩ·m2 criterion (Rwet × A ≥ 40). The measurements used 1000 V DC and a 2 min dwell; Rwet was obtained in a salted bath with a solution resistivity < 3500 Ω·cm. The median Rdry was 42.4 GΩ, whereas the median Rwet was 462.5 MΩ, resulting in a median Rdry/Rwet ratio of ~110×. Three modules (8.1%) failed the 40 MΩ·m2 limit already in the dry state, whereas eight modules (21.6%) failed under IEC-wet conditions; five were dry-pass/wet-fail cases that would have passed dry screening. For a representative area A = 1.8 m2, a practical conservative dry triage threshold of approximately 55.5 GΩ identifies modules needing IEC-wet verification rather than serving as a stand-alone limit. Overall, combining dry and IEC-wet measurements improves safety and supports sustainability through resource-efficient repowering/revamping and end-of-life decisions in large PV fleets, particularly in hot climates.
Poulek et al. (Sun,) studied this question.