This paper presents an improved corrective security constrained optimal power flow (CSCOPF) for a meshed AC/DC power transmission network with voltage source converter based multi-terminal HVDC (VSC-MTDC) grids. The security constrains of N-1 contingencies for both AC and DC networks are fully considered in the CSCOPF problem. The corrective actions employed in this paper include not only the traditional long-term rescheduling control actions of the AC system, but also the short term post-contingency fast corrective control of multi-terminal VSC-HVDC. A hybrid method is developed to solve the improved CSCOPF problem and the effectiveness of the proposed method is evaluated and demonstrated in this paper by two example meshed AC/DC power systems.
No takes yet. Share an insight, caveat, or question.
Cao et al. (2015) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: