Rush order insertion is widespread in the enterprises that apply make-to-order production mode which affects the stability of production system. This article studies rush order insertion rescheduling problem (ROIRP) under hybrid flow shop (HFS) with multiple stages and multiple machines. A mathematical model simultaneously considering constraints such as lots, sequence-dependent set-up times and transportation times with objectives to minimise makespan, total transportation time and total machine deviation between the initial scheduling plan and the event-driven rescheduling plan is developed and NSGA-III is applied to solve the problem. Three groups of experiments are carried out which verify the suitability of NSGA-III for HFS scheduling problem with multi-objective and multi-constraint, the effectiveness of NSGA-III for the proposed ROIRP and the feasibility and effectiveness of the proposed model and algorithm in solving the ROIRP of a realistic ship pipe parts manufacturing enterprise.
No takes yet. Share an insight, caveat, or question.
He et al. (2019) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: