Some of the basic concepts and terminology of project networking are developed. The Critical Path Algorithm in. corporated in the C-E-I-R proprietary scheduling system RAMPS (Resource Allocation and Multi-Project Scheduling) is described. The error detection and network analysis features of the algorithm are also described.
No takes yet. Share an insight, caveat, or question.
Mark M. Klein (1967) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: