An Electric Power Research Institute (EPRI) sponsored evaluation of the operation and maintenance (O&M) experience at seven selected photovoltaic installations in the United States is presented. The presentation of the actual O&M costs experienced by the seven sites, documentation of the largest problem areas, identification of failure causes, and projections of O&M costs for future installations are included.>
No takes yet. Share an insight, caveat, or question.
K. Conover (1990) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: