Answers are grounded in this paper and cite their sources.
We present a linear programming based heuristic for the solution of a class of aggregate level planning problems in hybrid flowshops (flowshops with several machines per stage). First, the general planning problem is modelled as multi-level with parallel processors, multi-item, capacitated, lot-sizing with set up times. We suggest a hierarchical approach which sequentially loads the stages; each stage is constrained by the solution of its preceding stage and each stage is treated as a multi-item, capacitated, lot-sizing problem with setup times on parallel processors. We show how this latter problem may be reformulated and solved heuristically as a sequence of network problems (trans-shipment problems) in which the amount of capacity lost in setups is fixed for each period and each processor. The model is within the computing reach of a PC.
No takes yet. Share an insight, caveat, or question.
Aghezzaf et al. (1998) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: