We introduce a methodology for automated production planning of semiconductor manufacturing based on iterative linear programming (LP) optimization and discrete-event simulation calculations. The LP formulation incorporates epoch dependent parameters for flow times from lot release up to each operation on each manufacturing route. LP-derived release schedules are used as input to the simulation model, from which statistics on flow times are collected and used to reformulate the LP model for a revised planning calculation. Iteration continues until satisfactory agreement between simulation and LP models is obtained. We demonstrate in experiments on an industry data set that a relatively small number of iterations is required to develop a production plan correctly characterizing future flow times as a function of factory load and product mix. The methodology makes possible automated production planning of semiconductor manufacturing on an engineering work station.
No takes yet. Share an insight, caveat, or question.
Hung et al. (1996) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: