We consider a scheduling environment with m (m ≥ 1) identical machines in parallel and two agents. Agent A is responsible for n 1 jobs and has a given objective function with regard to these jobs; agent B is responsible for n 2 jobs and has an objective function that may be either the same or different from the one of agent A. The problem is to find a schedule for the n 1 + n 2 jobs that minimizes the objective of agent A (with regard to his n 1 jobs) while keeping the objective of agent B (with regard to his n 2 jobs) below or at a fixed level Q. The special case with a single machine has recently been considered in the literature, and a variety of results have been obtained for two-agent models with objectives such as f max , ∑ w j C j , and ∑ U j . In this paper, we generalize these results and solve one of the problems that had remained open. Furthermore, we enlarge the framework for the two-agent scheduling problem by including the total tardiness objective, allowing for preemptions, and considering jobs with different release dates; we consider also identical machines in parallel. We furthermore establish the relationships between two-agent scheduling problems and other areas within the scheduling field, namely rescheduling and scheduling subject to availability constraints.
No takes yet. Share an insight, caveat, or question.
Leung et al. (2009) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: