Electric utilities are increasingly examining cost-effective opportunities to utilise demand-side management initiatives, such as interruptible contracts to reduce the need for additional capacity. Techniques are presented for conducting interruptible load analysis using sequential Monte Carlo simulation. A bisection search approach was developed to effectively determine the interruptible load carrying capability. An index, designated the avoidable additional generating capacity, is proposed and a procedure to calculate it is presented. Numerical studies were performed to indicate the possible applications of the proposed techniques.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2001) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: