This paper presents a multistage stochastic programming formulation of a transmission-constrained economic dispatch subject to multiarea renewable production uncertainty, with a focus on optimizing the dispatch of storage in real-time operations. This problem is resolved using stochastic dual dynamic programming. The applicability of the proposed approach is demonstrated on a realistic case study of the German power system calibrated against the solar and wind power integration levels of 2013-2014, with a 24-h horizon and 15-min time step. The value of the stochastic solution relative to the cost of a deterministic policy amounts to 1.1%, while the value of perfect foresight relative to the cost of the stochastic programming policy amounts to 0.8%. The relative performance of various alternative real-time dispatch policies is analyzed, and the sensitivity of the results is explored.
No takes yet. Share an insight, caveat, or question.
Papavasiliou et al. (2017) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: